LiveIndependent · Delivery tooling2026

Mahdar محضر

Meeting minutes that prove themselves · version 2.0, live

100%of actions, owners and due dates on 20 labelled meetings
01The problem

Why it exists

A recording or transcript goes in. Out come minutes, decisions, owned action items with real dates, and a RAID risk register, each linked to the exact words said. Version 2.0 follows actions across a series of meetings and tracks them in one place. Built and run like a real project, with a PRD, roadmap, RAID log, ADRs, test plan and a GitHub backlog.

02The system

What I built

Recordingchunked, Whisper
Extractionthree parallel passes
Evidence checkevery quote found in transcript
Action trackeracross the meeting series
ExportsJira, GitHub, PDF, status
  1. Audio pipeline: in-browser conversion to 16 kHz WAV, 5-minute chunks, Whisper large-v3-turbo, recordings up to about 60 minutes
  2. Three parallel extraction passes with a bilingual deadline calendar ("next Thursday", «الأحد القادم»)
  3. Evidence grounding: every item's quote is verified against the transcript and linked to the line
  4. Meeting series: the next meeting marks each open action done, in progress or blocked, and a status changes only when its quote is found in the new transcript
  5. An action tracker across all meetings with per-owner follow-up messages, live transcription while recording, and Teams/Zoom speaker import
  6. Editable minutes; Jira CSV, GitHub, Markdown, email, calendar and PDF exports; a weekly red/amber/green status report
  7. A zero-cost safety net: lines with risk language that the register misses are listed for review, never added to it
03The result

What it achieved

On 20 labelled meetings in English, Arabic and mixed language, 14 of them never used for tuning: 100% of actions found at 96% precision, 100% correct owners and 100% of quotes verified. The follow-up pass got 18 of 18 statuses right. Moving weekday arithmetic from the model into code lifted due dates from 82% to 100%. Offline, the safety net would catch between 1 and 3 of the 4 risks the model missed in the last complete run.

Stack

JavaScriptCloudflare WorkersGroq gpt-oss-120bWhisperWeb Audio APIJSON SchemaRAID · ADRs · PRD

Timeline

2026

My role

Product + engineering